Reserve from the case
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Sep 10 - Sep 15
Reserve from the case
Ships within 48 hours · Estimated delivery Sep 10 - Sep 15
- Bon 12-882
so concrete must be completely dry 48 to 72 hours for thin overlays and up to 28 days for ready-mix concrete
construction
CPR is a polymerized Hydraulic & Portland cement based concrete patching mix that can be shaped and formed on curbs and stairs or troweled vertically or overhead
Mark-IV Dust Buggy - Joint Clean Out Machine Green - Bon 12-882The Mark IV is a high performance, high precision saw designed to clean out control joints, remove the old joint filler, and make straight, accurate cuts in concrete up to 2 deep. A specially designed blade guard allows the operator to see the blade yet still covers 98% of it for excellent dust control and a high degree of accuracy. The handle and frame are designed for more stability and adjustable height that rotates to get closer to walls or racks.
Pay in 4 interest-free payments of $255.31 Learn more